Silver Mountain Existing Development

Silver Mountain Holiday Resort - Existing Development

As tourism and leisure markets become ever more congested, and consumers ever more sophisticated, how can investors ensure a solid return in their resort investment?

Silver Mountain answers this critical question and set out the most important ingredients for a successful resort. Increasingly, modern conceptions of luxury, value for money and convenience fall well beyond the parameters of the traditional resort model. The once-a-year, two-week holiday is becoming a thing of the past, making way for more contemporary concepts such as eco-tourism, spa breaks, weekend breaks and fractional ownership. Now entering an age where consumers have more money to enjoy than ever before and more time in which to spend it, these consumers have harnessed a more developed picture of what they can reasonably expect from a resort experience.

The existing development is built on 2.5 hectares of land, comprising 4 blocks of flats, a multifunctional commercial building with restaurant (140 persons capacity), club (200 persons capacity), conference rooms and spa centre, including equipped fitness room, heated indoor swimming pool, heated infinity pool, jacuzzi, dry and wet sauna.


Silver Mountain Existing Development

Silver Mountain Existing Development

High quality finishes:

PVC floor, Gerflor
Ceramic Tiles, Graniti Fiandre
Wooden stairs, KAHRS and Ecolemn Entrance door, Nusco
Bathroom equipment, Duravit and Kohle 

Silver Mountain Existing Development

The apartments are completely furnished and equipped. In A and B buildings, apartments have also card access. 


Silver Mountain Existing Development
Silver Mountain Existing Development

Leisure and sports facilities

Being displayed on GF+2F, the multifunctional building has a total net area of 2,598 sq m, comprising a restaurant, a club, 2 conference rooms and a spa center.

 

SPA center

Equipped fitness room

Heated indoor swimming pool: 16m (length) x 5m (width) x 1.4m (depth) 

Heated Infinity pool: 8m (length) x 4m (width) x 1.4m (depth) 

Jacuzzi: 2m (length) x 2m (width) x 1m (depth)

Dry and wet sauna

Restaurant

Position: 1 F

GLA:  455 sq m  

GBA: 701 sq m 

Capacity: 140 persons

75% equipped kitchen

Club

Position: GF

GLA: 224 sq m 

GBA: 506 sq m

Capacity: 200 persons

2 conference rooms

Position: GF

GLA: 148 sq m

GBA: 195 sq m



Silver Mountain Existing Development
Silver Mountain Existing Development
Silver Mountain Existing Development
 
Silver Mountain Existing Development
 

Video presentation of the existing development